Build week question
#1
Senior Member
Thread Starter
Join Date: Nov 2000
Location: Marietta, GA
Posts: 856
Likes: 0
Received 2 Likes
on
2 Posts
Car: '84 Z28
Engine: L69
Transmission: 700R4
Axle/Gears: 3.73
Build week question
This year 2013 is exactly like the year 1985 as far as days of the week.
My question is, the week of June 3rd-7th. Would that be considered 06A or 06B? Since Saturday fell on the 1st.
My question is, the week of June 3rd-7th. Would that be considered 06A or 06B? Since Saturday fell on the 1st.
#2
Moderator
Join Date: Mar 2001
Location: Doghouse ······································ Car: 1989 Formula 350 Vert Engine: 350 L98 Transmission: 700R4 Axle/Gears: B&W 3.27
Posts: 14,235
Received 163 Likes
on
118 Posts
Car: 87 Formula T-Top, 87 Formula HT
Engine: 5.1L TPI, 5.0L TPI
Transmission: 700R4, M5
Axle/Gears: Sag 3.73, B&W 3.45
Re: Build week question
I would think 2nd week... As Saturday would be the last work day of the week, and the first day of the month... Not sure really.
Find a Firebird ID by the numbers or Camaro ID by the numbers Book
Find a Firebird ID by the numbers or Camaro ID by the numbers Book
#3
Senior Member
Thread Starter
Join Date: Nov 2000
Location: Marietta, GA
Posts: 856
Likes: 0
Received 2 Likes
on
2 Posts
Car: '84 Z28
Engine: L69
Transmission: 700R4
Axle/Gears: 3.73
Re: Build week question
I would think so too. Some plants were operating on Saturdays as overtime. Not sure if Norwood or Van Nuys were up and running on select Saturdays. Thanks for the response.
Thread
Thread Starter
Forum
Replies
Last Post